I ll make a mark in line with the face and the back of the fascia to create my bend lines.
Metal roof gable trim detail.
With over 55 years of experience metal sales is the nation s largest manufacturer of metal roofing wall and building systems.
Explore our products today.
Make a 1 mark from the edge on top of the gable trim.
Gable trim designed to finish off the edge of the roof gable or rake.
Do not step on panel ribs or on trim pieces to prevent kinking.
Gable trim buy metal roofing direct 10 long length 26 gauge metal installs at the rake end of the roof matches the color of the panel use with tacky tape.
It is designed for maximum effectiveness and aesthetics.
The edge of your metal roof needs a different trim than the peak of your metal roof.
Striations and bends on the flashing provide strength and match the lines of your other edge trims.
The peak of your metal roof needs a different trim from the gables.
At the gable edge use a gable or sidewall flashing.
For the corner detail at the eave mark the gable trim and then make a series of simple folds so that when you look at the corner of the roof it is clean and boxed in.
How many do i need.
Two slopes meeting on your metal roof need their own metal.
Gable rake trim gable or rake trim is attached to the sloping edges of roof gables to prevent wind driven rain from penetrating the exposed undersides of the roof panels that connect the ridge and the eave of your home.
How to cut and finish gable trim at the eave of a metal roof make a 3 mark from the edge on top of the gable trim.
Fold the side in first then fold the top down and close off this hole.
Using t bevel which was previously locked to the pitch of your roof mark a line on the drip edge side of the gable up to the 3 mark.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
Add up the total amount of gable of the roof and divide by 9 5 10 long length.
Roof pitch the metal roofing panels shown in this manual require a min imum slope of 2 สบ per foot to ensure proper drainage.
Gable rake trim installation subscribe to our page for more metal roofing videos.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
The gable trim combined with sealant provides a watertight seal for your roof system.